Project logistics via RoRo, breakbulk, multimodal.
Get Formal Quote & PlanProject cargo covers construction machinery, complete production lines and oversized equipment that does not fit standard boxes, moved by RoRo, breakbulk, flat-rack and open-top.
One team handles site survey, lashing and reinforcement, US clearance and inland delivery, with our own broker and local agents.
Excavators, loaders and similar equipment.
Dismantled, numbered and shipped in batches.
Flat-rack, open-top or breakbulk for oversized units.
Consolidated shipments tied to a project schedule.
| Lane | US West | US Central | US East |
|---|---|---|---|
| Matson oversized truck (150KG+) | $4.24–3.43 | $4.12–3.58 | $4.53–3.83 |
| ZIM oversized truck (150KG+) | $3.89–3.08 | $3.77–3.23 | $4.18–3.48 |
USD per KG for oversized truck delivery above 150KG, priced by US ZIP zone plus a USD 76 handling fee per shipment. Project cargo is quoted case by case on volume, weight, route and handling — a site survey precedes the formal plan and quote.
Confirm dimensions, weight, centre of gravity and loading conditions.
Choose equipment type, vessel, lashing plan and route.
Crate, frame or palletize with photo records.
RoRo, breakbulk or flat-rack with loading supervision.
Own broker, DDP duty paid.
Crane, forklift and placement at site.
Open-top for over-height cargo, flat-rack for over-width or over-length, decided by the actual dimensions.
US inland oversize moves need permits; we arrange them and plan the route.
Yes, and we recommend full-value cover for project moves.
Crane, forklift and site placement can be arranged — confirm site and road access in advance.
Typically 30-45 days door to door depending on route and handling.